Sharper Shower Estimates, Kerdi Showers & Estimate Versions

· 2 min read

This release focuses on the bathroom estimate — making the numbers more accurate out of the gate, building tile showers the way they are actually installed, and giving every estimate a clear original-versus-working version history.

More accurate shower and bathroom quantities

We tightened the quantity logic so a small shower no longer estimates like a whole room (#2200, #2201, #2203):

  • Shower dimensions like "34x34" are read as inches, not feet.
  • Shower-pan items use a small pan minimum instead of the room's minimum floor area.
  • Scope items no longer inflate lump-sum or area lines — fixed-scope assemblies stay at the correct quantity instead of being multiplied, which removes the runaway material totals some bathroom estimates were showing.
  • Whole-room flooring is no longer added to a shower-only job. If you did not ask for new room flooring, the AI will not quietly add a full room of it. Ask for flooring explicitly when you want it.
  • "To the studs" / "already gutted" notes suppress demolition. If the space is already torn out, you are no longer charged to demo it again.

Tile showers now build the full Schluter Kerdi system

When your scope describes a tile shower, the estimate now includes the complete Schluter Kerdi assembly — Kerdi base, curb, drain, and waterproofing kit (with integrated waterproofing), Schluter trim, backerboard, and wall/floor tile plus grout — instead of a single generic membrane line (#2204). The estimate you send reflects the materials and labor a tile pro would actually use.

Original (V1) vs. working (V2) estimate versions

Every estimate now keeps a clear, recoverable history (#2202):

  • The initial generation is saved as Version 1 (V1) — immutable, always viewable, and pinned as your baseline.
  • The first edit forks a Version 2 (V2) working copy, so your original AI estimate is never overwritten.
  • You can list all versions, open any single version, and compare two versions side by side to see exactly what changed.

Pricing you can trust

Behind the scenes, every unit cost is pulled from the best available source — your own logged actuals first, then a region-adjusted cost book covering both labor and material, with sensible fallbacks below that (#2205). The more real jobs you log, the more your estimates price the way you price.

Read the full guide in Shower Estimates & Estimate Versions.